Our team has a deep track record of working as dedicated team players to provide value engineering and innovative solutions that keep projects moving forward.
K – 12 Schools
Griffith Middle School Modernization including New Gymnasium & Classroom Building, Downey
Sussman Middle School Modernization including New Gymnasium & Classroom Building, Downey
Fremont ES Modernization, Riverside
Culver City High School New 2-Story Science building, Culver City
Los Alamitos High School Aquatic Center, Los Alamitos
Azusa High School Athletic Artificial Turf Field, Azusa
Gladstone High School Athletic Artificial Turf Field, Azusa
LA High School of Arts, 2-Story Building with Amphitheatre, Los Angeles
Universities and Community Colleges
Harvey Mud College Dorm and Site Improvements, Claremont
RSCC Humanities Building and Canyon College Athletic Center, Santa Ana
Orange Coast College, Watson Hall, Costa Mesa
ABC Building Orange Coast College, Costa Mesa
Library Addition/Renovation, California State University, Long Beach
Patterson Hall 3 Replacement, California State University, Long Beach
Parking Structure 2 and 3, California State University, Long Beach
Chapman University Library and Music Hall with Basement, Orange
Reiber Hall, UCLA, Los Angeles
Hedrick Hall, UCLA, Los Angeles
Student Health and Wellness Center, UCSD, San Diego
Healthcare
Kaiser Specialty MOB with 7-Story Parking Structure, Santa Clarita
Canyon Ridge Hospital Expansion, Chino
Medical Office Building with 3-Level Subterranean Parking, Kaiser, Watts
Kaiser Market Street 3-Story MOB, Ventura
Apple Valley Medical Center MRI & Urgent Care Expansion
Kaiser South Bay 5-Story Replacement Hospital, Harbor City
Kaiser South Bay Interim Patient Building, Harbor City
Mary’s Medical Center Oasis, Victorville
Kaiser Maternal Child Preoperative Building and 4-Story Parking Structure, Harbor City
Kaiser Replacement Hospital & Central Plant, Panorama City
Sierra Vista Hospital, Sacramento
Medical Office Building, Kaiser, Diamond Bar
Medical Office Building 2, 3 and 4, Kaiser, San Marcos
Parnell Medical Plaza with 3-levels Subterranean Parking, West Los Angeles
American Red Cross Regional Blood Distribution Center, Pomona
Public Works
East Garden Grove-Winterberg Channel Phase 2 and 3 Improvements, Garden Grove
Advanced Water Treatment Facility and Related Pipeline and Wells, Fountain Valley
Taxiway for Air Bus A380 Maintenance Facility
Storm Water Tunnel (5 m diameter, 20 m deep and 0.5 km long)
High Desert Power Plant, Victorville
Diemer Water Treatment Plant Expansion, Yorba Linda
MTA Bauchet Street, Parking Structure and Maintenance Building, Los Angeles
Valley Station Power Plant, Sun Valley
Skinner Water Treatment Plan Oxidation Retrofit, Winchester
Hacienda Road Slope Repair, La Habra Heights
On-Call Geotechnical Engineering Services, City of Los Angeles
Annual Services Contract, Geotechnical and Material, IEUS, Chino
Long Beach Runway 12-30 Rehabilitation
Ontario Airport Taxiway ‘N’ Expansion
ARCTIC, Anaheim
Bureau of Land Management
Hospitality, Commercial & Industrial
Temescal Valley Business Park & Creek Realignment, Temecula
Costa Verde Towers with 3-level Subterranean Parking, La Jolla
Valley View Casino Hotel 12-Story, Valley Center
Kimberly Clark Cogeneration Power Plant, Fullerton
Seacoast Inn, 4-Story with Basement, Imperial Beach
Southern California Logistics Airport, Lots 18, 19, 43, 43B (150k to 900k sq.ft warehouse buildings)
Azusa Business Center
Parking Structures
North East 5-Level Parking Structure, Kaiser South Bay